Waste Water Treatment Plant at Northwest Faro

Construction of a new reservoir in reinforced concrete, consisting of two cells of 5,000m3 each, next to the existing Final Reservoir of the Western Adductor.
It is a reservoir made up of two square-shaped cells with a unit capacity of 5000 m3 to store drinking water.

The main works in this endeavor are as follows:

  • Earthmoving works with emphasis on rock excavation;
  • Construction works in reinforced concrete;
  • Supply and installation of carbon steel pipes and electromechanical equipment;
  • Supply, assembly in cast iron piping (FFD) in ditch;
  • Execution of rainwater drainage;
  • Execution of connections to existing hydraulic circuits;
  • Electrical, instrumentation and safety installations;
  • Installation of a telemanagement system;
  • Exterior arrangements.

The contract included the supply and assembly of all associated electromechanical equipment.

Main quantities:

  • General excavation – 13,640 m3
  • Concrete C30/37 – 3,135.00 m3
  • Total weight of armor – 377 tons
  • Total formwork area – 9,450 m2
See all Details

Customer: Águas do Algarve, SA
Contract type: Lump sum
Construction date: 2020 – 2022
Cost: EUR 2.391.030,19

Request more Information

Fill out the form to the side for additional information.

Seth will contact you as soon as possible.

Seth, SA requests your consent to register and process the personal data provided by our services in the processes of sending the requested information. We guarantee that the treatment and use of the information collected will be exclusively for this purpose, the consent being freely revocable and at any time you can exercise your rights of access, rectification, opposition and elimination through the email comunicacao@seth.pt. If you agree, please click on “Consent to data collection and processing”.

Pesquisar

Search