Kamsar Container Terminal, Phase III

The third phase of the work to expand the Global Alumina Corporation, SA Container Quay (Kamsar) was comprised by various maritime and port construction works, including the extension and enlargement of the existing quay with a berthing length of 170.00 m and a breadth of 17.50 m, duly equipped.

Was applied a reinforced concrete solution in situ (beams and compression slab) involving the use of prefabricated concrete slabs acting as shuttering.
This superstructure was supported on 103 tubular piles (914 mm diameter each) driven into the natural ground, with an average length of 51 m, the upper part (7.2 m) concreted.

See all Details

Client: GAC – Guinea Alumina Corporation
Contract type: Lump Sum
Construction period: 2015-2016
Cost: EUR 12.401.909,85

Request more Information

Fill out the form to the side for additional information.

Seth will contact you as soon as possible.

Seth, SA requests your consent to register and process the personal data provided by our services in the processes of sending the requested information. We guarantee that the treatment and use of the information collected will be exclusively for this purpose, the consent being freely revocable and at any time you can exercise your rights of access, rectification, opposition and elimination through the email comunicacao@seth.pt. If you agree, please click on “Consent to data collection and processing”.

Pesquisar

Search