|
Design-Build
2004-2005
7.000.000,00
Job in Consortium.
|
|
Oeiras Pleasure Harbour
Oeiras (Portugal)

|
|
Lump Sum
2003-2004
2.200.000,00
Work included installation of 36 piles; concrete piles at bottom of sea level; installation of 4 concrete foundations and fender system.
|
|
Rebuilding of Fender System - Nova Cimangola Export Jetty
Luanda, Angola

|
|
Unit Prices
2001-2004
21.038.183,00
This is the first Portuguese quay-wall employing the combined wall system with sheet-piles and HZ beams. Job in Consortium
|
|
Bulk Terminal, Aveiro Harbour
Gafanha da Nazaré

|
|
Unit Prices
2002-20035.600.000,00
|
|
Breakwater Emergency Repair
Pol Pier - Praia da Vitória, Azores

|
|
|
|
Guiding Piles for Floating Pontoons Dettached Platform and Bank Retention
Cais do Sobré Interface, Lisbon

|
|
Design and Build
20032.490.303,00
|
|
Floating Berthing Pontoons and Access Gangways
Cais do Sodré Interface,Lisbon

|
|
|
|
Porto Moniz Harbour
Porto Moniz, Madeira

|
|
|
|
Fuah Mulaku Harbor
Republic of Maldives

|
|
|
|
Porto Moniz Harbour
Porto Moniz, Madeira

|
|
|
|
Alterations to the Dock
Carregal do Sul

|
|
|
|
Outlaying Breakwater
Castelo do Neiva

|
|
|
|
EXPO’98 - Enclosing Dike & Locks
Lisbon

|
|
|
|
EXPO’98 - Marina Dockside Area
Lisbon

|
|
|
|
EXPO’98 AcquaMatrix
Lisbon

|
|
|
|
Project Fénix - Enlargement of Pier 3
Lisnave Internacional, SA

|
|
|
|
Barreiro Road-Rail-Ferry Terminal
Floating Pontoons & Access Walkways

|
|
|
|
Marinas & Ports for Light Fishing Boats
Portugal

|
|
|
|
Clinker & Cement Export Terminal
Luanda, Angola

|
|
|
|
Fishing Port
Ishtun, Republic of Yemen

|
|
|
|
Cassinga Project - Ore Terminal
Moçâmedes, Angola

|
|
|
|
U.S. Navy - POL Pier
Terceira, Azores

|