Marine Works
   

 

Customer
United States Navy

Construction Inspection
Naval Facilities Engineering Command

Type of contract
Construction

Construction date
1962-1963

Volume of Concrete
75 000 m3

Piles Driven
40 m long

Breakwater
650 m / 500,000 m3

Berth
260 m

Draft
12 m

   Ficha da obra em PDF (132 KB)

 

 

 

U.S. Navy - POL Pier
Terceira, Azores

U.S. Navy - POL Pier

 

 

 

Customer
Companhia Mineira do Lobito

Type of contract
Series of prices

Construction date
1968 - 1972

Piles Driven
43 m comp.

Berth
600 m

Ship-Handling Capacity
300 000 tons d.w.t.

   Ficha da obra em PDF (133 KB)

 

 

 

Cassinga Project - Ore Terminal
Moçâmedes, Angola

Cassinga Project - Ore Terminal

 

 

 

Customer
CIMANGOLA U.E.M.

Construction Inspection
Dar Al-Handasa Consultants (Beirut)

Type of contract
Turn-Key

Construction date
1982 - 1984

Piles Driven
30 m long

Pier (access/berthing)
1000 +120 m

   Ficha da obra em PDF (137 KB)

 

 

 

Clinker & Cement Export Terminal
Luanda, Angola

Clinker & Cement Export Terminal

 

 

 

Customer
Fisheries Ministry

Construction Inspection
Scandia Consult

Type of contract
Turn-Key

Construction date
1981 - 1984

Piles Driven
30 m long

Pier
400 + 320 m


   Ficha da obra em PDF (133 KB)

 

 

 

Fishing Port
Ishtun, Republic of Yemen

Fishing Port

 

 

 

Customer
Lisnave Internacional, SA

Design
Imoconsult

Construction Inspection
Proman

Type of contract
Turn-Key

Construction date
1995 - 1996

Cost (PTE)
526,000,000

Volume of Concrete
6,200 m3

Cast-in-Place Piles
36 + 69 (1000 mm - 800 mm)

Armor Rock
18,000 m3

Dolphin
14 x 7 x 10 m

   Ficha da obra em PDF (263 KB)

 

 

 

Project Fénix - Enlargement of Pier 3
Lisnave Internacional, SA

Project Fénix - Enlargement of Pier 3

 

 

 

Customer
Caminhos de Ferro Portugueses, EP

Type of contract
Turn-Key

Construction date
1994 - 1995

Cost (PTE)
198.000.000,00

Marine Classification Agency
RINAVE

Pontoons
2 units

Length : 22m
Breadth : 9m
Draf: 2,5m


   Ficha da obra em PDF (116 KB)

 

 

 

Barreiro Road-Rail-Ferry Terminal
Floating Pontoons & Access Walkways

Barreiro Road-Rail-Ferry Terminal

 

 

 

Dredging

Pile Driving

Rock-fill

Water & Sewage

Electrical Installation

Access Walkways

   Ficha da obra em PDF (197 KB)

 

 

 

Marinas & Ports for Light Fishing Boats
Portugal

Marinas & Ports for Light Fishing Boats

 

 

 

Customer
ECA2

Type of contract
Turn-Key

Construction date
1998

Cost (PTE)
240.000.000,00

Piles
58 / 500 (12/16 m)

Steel Structures
110 tons

   Ficha da obra em PDF (499 KB)

 

 

 

EXPO’98 AcquaMatrix
Lisbon

EXPO’98 AcquaMatrix

 

 

 

Customer
Sociedade Parque EXPO, SA

Type of contract
Turn-Key

Construction date
1998

Cost (PTE)
500,000,000

   Ficha da obra em PDF (390 KB)

 

 

 

EXPO’98 - Marina Dockside Area
Lisbon

EXPO’98 - Marina Dockside Area

 

 

 

Customer
Sociedade Parque EXPO, SA

Type of contract
Turn-Key

Construction date
1998

Cost (PTE)
3.200.000.000,00


   Ficha da obra em PDF (436 KB)

 

 

 

EXPO’98 - Enclosing Dike & Locks
Lisbon

EXPO’98 - Enclosing Dike & Locks

 

 

 

Customer
Maritime-Port Institute

Design
Maritime-Port Institute

Type of contract
Turn-Key

Construction date
January / December 2000

Cost (PTE)
455.000.000,00

   Ficha da obra em PDF (134 KB)

 

 

 

Alterations to the Dock
Carregal do Sul

Alterations to the Dock

 

 

 

Customer
Maritime-Port Institute

Design
Maritime-Port Institute

Type of contract
Turn-Key

Construction date
August 1999 / September 2000

Cost (PTE)
346.000.000,00

   Ficha da obra em PDF (129 KB)

 

 

 

Outlaying Breakwater
Castelo do Neiva

Outlaying Breakwater

 

 

 

Customer
Administração dos Portos da Região Autónoma da Madeira

Type of contract
Turn-Key

Construction date
2002-2003

Cost (EUR)
15.958.914,00

Notes
Job in consortium


   Ficha da obra em PDF (155 KB)

 

 

 

Porto Moniz Harbour
Porto Moniz, Madeira

Porto Moniz Harbour

 

 

 

Customer
Metropolitano de Lisboa, E.P.

Type of contract
Turn-Key

Construction date
2002-2003

Cost (EUR)
2.424.619,00


   Ficha da obra em PDF (129 KB)

 

 

 

Guiding Piles for Floating Pontoons
Dettached Platform and Bank Retention
Cais do Sobré Interface, Lisbon

Guiding Piles for Floating Pontoons<br>Dettached Platform and Bank Retention

 

 

 

Customer
APRAM (Madeira)

Type of Contract
Unit Price

Construction period
2000

Cost (PTE)
115.620.00$00


Architect/Engineer
WW - Consultores de Hidráulica

   Ficha da obra em PDF (130 KB)

 

 

 

Porto Moniz Harbour
Porto Moniz, Madeira

Porto Moniz Harbour

 

 

 

Customer
Ministry of Constrution and Public Works

Type of contract
Turn-Key

Construction date
2000-2002

Cost (EUR)
9.700.000,00

Constrution consortium
Højgaard & Schultz a/s SETH, Lda.

Notes

Job in consortium.


   Ficha da obra em PDF (130 KB)

 

 

 

Fuah Mulaku Harbor
Republic of Maldives

 Fuah Mulaku Harbor

 

 

 

Customer
Metropolitano de Lisboa, E.P.

Type of contract
Design and Build

Construction date
2003


Cost (EUR)
2.490.303,00


   Ficha da obra em PDF (143KB)

 

 

 

Floating Berthing Pontoons and Access Gangways
Cais do Sodré Interface,Lisbon

Floating Berthing Pontoons and Access Gangways

 

 

 

Customer
Brown & Root Services Corp.
(United States Navy)

Contract Type
Unit Prices

Construction date
2002-2003


Cost (EUR)
5.600.000,00

Notes
The world´s largest CORE-LOCS at the time of this work.
Job in consortium.


   Ficha da obra em PDF (129 KB)

 

 

 

Breakwater Emergency Repair
Pol Pier - Praia da Vitória, Azores

Breakwater Emergency Repair

 

 

 

Customer
Administração do Porto de Aveiro, SA

Type of contract
Unit Prices

Construction date
2001-2004

Cost (EUR)
21.038.183,00

Notes:

This is the first Portuguese quay-wall employing the combined wall system with sheet-piles and HZ beams.
Job in Consortium


   Ficha da obra em PDF 155 KB

 

 

 

Bulk Terminal, Aveiro Harbour
Gafanha da Nazaré

Bulk Terminal, Aveiro Harbour

 

 

 

Customer
Nova Cimangola

Type of contract
Lump Sum

Construction date
2003-2004

Cost (EUR)
2.200.000,00

Notes:

Work included installation of 36 piles; concrete piles at bottom of sea level; installation of 4 concrete foundations and fender system.


   Ficha da obra em PDF 169 KB

 

 

 

Rebuilding of Fender System - Nova Cimangola Export Jetty
Luanda, Angola

Rebuilding of Fender System - Nova Cimangola Export Jetty

 

 

 

Customer
Câmara Municipal de Oeiras

Type of Contract
Design-Build

Construction Date
2004-2005

Cost (EUR)
7.000.000,00

Notes

Job in Consortium.


   Ficha da obra em PDF (62 KB)

 

 

 