CustomerUnited States NavyConstruction InspectionNaval Facilities Engineering CommandType of contractConstructionConstruction date1962-1963Volume of Concrete75 000 m3Piles Driven40 m longBreakwater650 m / 500,000 m3Berth260 mDraft12 m
U.S. Navy - POL Pier Terceira, Azores
CustomerCompanhia Mineira do LobitoType of contractSeries of pricesConstruction date1968 - 1972Piles Driven43 m comp.Berth600 mShip-Handling Capacity300 000 tons d.w.t.
Cassinga Project - Ore Terminal Moçâmedes, Angola
CustomerCIMANGOLA U.E.M.Construction InspectionDar Al-Handasa Consultants (Beirut)Type of contractTurn-KeyConstruction date1982 - 1984Piles Driven30 m longPier (access/berthing)1000 +120 m
Clinker & Cement Export Terminal Luanda, Angola
CustomerFisheries Ministry Construction InspectionScandia Consult Type of contractTurn-Key Construction date1981 - 1984 Piles Driven30 m long Pier400 + 320 m
CustomerFisheries Ministry
Construction InspectionScandia Consult
Type of contractTurn-Key
Construction date1981 - 1984
Piles Driven30 m long
Pier400 + 320 m
Fishing Port Ishtun, Republic of Yemen
CustomerLisnave Internacional, SADesignImoconsultConstruction InspectionPromanType of contractTurn-KeyConstruction date1995 - 1996Cost (PTE)526,000,000Volume of Concrete6,200 m3Cast-in-Place Piles36 + 69 (1000 mm - 800 mm)Armor Rock18,000 m3Dolphin14 x 7 x 10 m
Project Fénix - Enlargement of Pier 3 Lisnave Internacional, SA
CustomerCaminhos de Ferro Portugueses, EPType of contractTurn-KeyConstruction date1994 - 1995Cost (PTE)198.000.000,00Marine Classification AgencyRINAVEPontoons2 units Length : 22mBreadth : 9mDraf: 2,5m
CustomerCaminhos de Ferro Portugueses, EPType of contractTurn-KeyConstruction date1994 - 1995Cost (PTE)198.000.000,00Marine Classification AgencyRINAVEPontoons2 units
Length : 22mBreadth : 9mDraf: 2,5m
Barreiro Road-Rail-Ferry Terminal Floating Pontoons & Access Walkways
DredgingPile DrivingRock-fillWater & SewageElectrical InstallationAccess Walkways
Marinas & Ports for Light Fishing Boats Portugal
CustomerECA2Type of contractTurn-KeyConstruction date1998Cost (PTE)240.000.000,00Piles58 / 500 (12/16 m)Steel Structures110 tons
EXPO’98 AcquaMatrix Lisbon
CustomerSociedade Parque EXPO, SAType of contractTurn-KeyConstruction date1998Cost (PTE)500,000,000
EXPO’98 - Marina Dockside Area Lisbon
CustomerSociedade Parque EXPO, SA Type of contractTurn-KeyConstruction date1998Cost (PTE)3.200.000.000,00
CustomerSociedade Parque EXPO, SA
Type of contractTurn-KeyConstruction date1998Cost (PTE)3.200.000.000,00
EXPO’98 - Enclosing Dike & Locks Lisbon
CustomerMaritime-Port InstituteDesignMaritime-Port InstituteType of contractTurn-KeyConstruction dateJanuary / December 2000Cost (PTE)455.000.000,00
Alterations to the Dock Carregal do Sul
CustomerMaritime-Port InstituteDesignMaritime-Port InstituteType of contractTurn-KeyConstruction dateAugust 1999 / September 2000Cost (PTE)346.000.000,00
Outlaying Breakwater Castelo do Neiva
CustomerAdministração dos Portos da Região Autónoma da MadeiraType of contractTurn-KeyConstruction date2002-2003Cost (EUR)15.958.914,00NotesJob in consortium
Porto Moniz Harbour Porto Moniz, Madeira
CustomerMetropolitano de Lisboa, E.P.Type of contractTurn-KeyConstruction date2002-2003 Cost (EUR)2.424.619,00
CustomerMetropolitano de Lisboa, E.P.Type of contractTurn-KeyConstruction date2002-2003
Cost (EUR)2.424.619,00
Guiding Piles for Floating PontoonsDettached Platform and Bank Retention Cais do Sobré Interface, Lisbon
CustomerAPRAM (Madeira)Type of ContractUnit PriceConstruction period2000Cost (PTE)115.620.00$00 Architect/EngineerWW - Consultores de Hidráulica
CustomerMinistry of Constrution and Public WorksType of contractTurn-KeyConstruction date2000-2002Cost (EUR)9.700.000,00Constrution consortiumHøjgaard & Schultz a/s SETH, Lda.NotesJob in consortium.
Fuah Mulaku Harbor Republic of Maldives
CustomerMetropolitano de Lisboa, E.P.Type of contractDesign and BuildConstruction date2003Cost (EUR)2.490.303,00
Floating Berthing Pontoons and Access Gangways Cais do Sodré Interface,Lisbon
CustomerBrown & Root Services Corp.(United States Navy)Contract TypeUnit PricesConstruction date2002-2003Cost (EUR)5.600.000,00NotesThe world´s largest CORE-LOCS at the time of this work.Job in consortium.
CustomerBrown & Root Services Corp.(United States Navy)Contract Type
Breakwater Emergency Repair Pol Pier - Praia da Vitória, Azores
CustomerAdministração do Porto de Aveiro, SAType of contractUnit PricesConstruction date2001-2004Cost (EUR)21.038.183,00Notes:This is the first Portuguese quay-wall employing the combined wall system with sheet-piles and HZ beams.Job in Consortium
CustomerAdministração do Porto de Aveiro, SAType of contract
Bulk Terminal, Aveiro Harbour Gafanha da Nazaré
CustomerNova CimangolaType of contractLump SumConstruction date2003-2004Cost (EUR)2.200.000,00Notes:Work included installation of 36 piles; concrete piles at bottom of sea level; installation of 4 concrete foundations and fender system.
CustomerNova CimangolaType of contract
Rebuilding of Fender System - Nova Cimangola Export Jetty Luanda, Angola
CustomerCâmara Municipal de OeirasType of ContractDesign-BuildConstruction Date2004-2005Cost (EUR)7.000.000,00NotesJob in Consortium.
CustomerCâmara Municipal de OeirasType of Contract
Oeiras Pleasure Harbour Oeiras (Portugal)