Some recent contracts awarded to SETH
(listed by dates):
| Job: |
Construção do Sistema de Intercepção Terreiro do Paço / Cais do Sodré |
| Job No: |
0917 |
| Awarded: |
January,2009 |
| Customer: |
Simtejo - Saneamento Integrado dos Municípios do Tejo e Trancão |
| Value: |
8.186.553,00 EUR |
| Project Manager: |
José Jerónimo |
| Comments: |
Job in Consortium |
| Job: |
Concepção/Construção do Abastecimento de Água e Saneamento às Ilhas de Culatra e da Armona |
| Job No: |
0914 |
| Awarded: |
July,2009 |
| Customer: |
Águas do Algarve, SA |
| Value: |
1.500.000,00 EUR |
| Project Manager: |
José Jerónimo |
| Comments: |
|
| Job: |
Modernização para a Fase 2A do Programa de Modernização das Escolas |
| Job No: |
0913 |
| Awarded: |
June,2009 |
| Customer: |
Parque Escolar. EPE |
| Value: |
22.680.401,00 EUR |
| Project Manager: |
José Jerónimo |
| Comments: |
Job in Consortium |
| Job: |
Réalisation d'un Quai de Service et Poste Clapet (Algerie) |
| Job No: |
0912 |
| Awarded: |
June,2009 |
| Customer: |
JV Snamprogetti, Chiyoda, Saipem, SPA |
| Value: |
2.400.000,00 EUR |
| Project Manager: |
Carlos Leal |
| Comments: |
GNL - 3Z Project Sonatrach S.P.A |
| Job: |
Combined Cycle Power Plant (Koudiet et Draouch), Water Intake Works, Algerie |
| Job No: |
0911 |
| Awarded: |
June,2009 |
| Customer: |
Iberdrola, SA |
| Value: |
6.464.000,00 EUR |
| Project Manager: |
Carlos Leal |
| Comments: |
|
| Job: |
Gas and Fuel Terminal at Bejaia (Alger) |
| Job No: |
0804 |
| Awarded: |
March,2008 |
| Customer: |
Port Authority of Bejaia (Alger) |
| Value: |
11.145.986,00 EUR |
| Project Manager: |
Carlos Leal |
| Comments: |
Job in Consortium |
| Job: |
Repair Breakwater - Phase III |
| Job No: |
0719 |
| Awarded: |
October,2007 |
| Customer: |
United States Navy |
| Value: |
EUR 8.098.398,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
Contract N62470-07-C-7019 |
| Job: |
Inspection and Maintenance/Reparation of the Marine Outfall at Guia (Portugal) |
| Job No: |
0718 |
| Awarded: |
October,2007 |
| Customer: |
Sanest |
| Value: |
EUR 612.000,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
|
| Job: |
Marine Outfall Works to Water Intake at Beni Saf (Algerie) |
| Job No: |
0715 |
| Awarded: |
July,2007 |
| Customer: |
Befesa / Cobra / Codesa / Sadyct |
| Value: |
EUR 9.733.600,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
Marine Outfall w/ 2,40 m diameter to Seawater Desalinization System. Job in Consortium. |
| Job: |
Transformation and Enlargement of Faro's WWTP |
| Job No: |
0714 |
| Awarded: |
March,2007 |
| Customer: |
Águas do Algarve |
| Value: |
EUR 6.984.000,00 |
| Project Manager: |
A. Jerónimo |
| Comments: |
Job in Consortium |
| Job: |
Rehabilitation and Reinforcement of a Quay in the Port of Lisbon |
| Job No: |
0709 |
| Awarded: |
March,2007 |
| Customer: |
Lisbon Port Authority |
| Value: |
EUR 13.658.125,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
Job in Consortium |
| Job: |
Construction of the Infrasctructures in the Harbour of Peniche - 1.st Stage |
| Job No: |
0704 |
| Awarded: |
February,2007 |
| Customer: |
IPTM - Instituto Portuário e dos Transportes Marítimos |
| Value: |
EUR 3.379.000,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Job in Consortium |
| Job: |
Repair Fuel Receipt Pier & Buoy Mooring (N62470-07-C-7001) |
| Job No: |
0703 |
| Awarded: |
February,2007 |
| Customer: |
United States Navy |
| Value: |
EUR 1.484.905,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
Work made for the Seth in 1961-1963 |
| Job: |
Repair Works in the Harbour of Porto Santo (Madeira's Archipelago) |
| Job No: |
0702 |
| Awarded: |
January,2007 |
| Customer: |
APRAM - Administração dos Portos da Região Autónoma da Madeira, SA |
| Value: |
EUR 18.470.220,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Job in Consortium |
| Job: |
Multipurpose Terminal in the Harbour of Leixões (Portugal) |
| Job No: |
0623 |
| Awarded: |
December,2006 |
| Customer: |
APDL - Administração dos Portos do Douro e Leixões, SA |
| Value: |
EUR 12.980.070,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Job in Consortium |
| Job: |
ERAP - Grid Intensification Component Package III |
| Job No: |
0617 |
| Awarded: |
October,2006 |
| Customer: |
EDM (Mozambique Electricity Authority) |
| Value: |
EUR 9.439.006,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
|
| Job: |
Fire / Crash / Rescue Facility - Construction of New Installations |
| Job No: |
0612 |
| Awarded: |
May,2006 |
| Customer: |
United States Navy |
| Value: |
EUR 7.435.420,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
Contract N62470-06-C-001 |
| Job: |
Rehabilitation of French Quay |
| Job No: |
0610 |
| Awarded: |
March,2006 |
| Customer: |
Compagnie des Bauxites de Guinee |
| Value: |
USD 2.635.956,00 |
| Project Manager: |
Villy Petersen |
| Comments: |
|
| Job: |
Port of Kamsar Expansion, Republic of Guinea |
| Job No: |
0607 |
| Awarded: |
March,2006 |
| Customer: |
Global Alumina Corporation |
| Value: |
USD 13.320,000,00 |
| Project Manager: |
Villy Petersen |
| Comments: |
|
| Job: |
Complete Conventional Buoy Mooring System for the Socorridos Terminal (Madeira, Portugal) |
| Job No: |
0604 |
| Awarded: |
July,2006 |
| Customer: |
EDM - Electricidade da Madeira |
| Value: |
EUR 1.782.500,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
|
| Job: |
WWTP, Lagoinha (Design-build) |
| Job No: |
0603 |
| Awarded: |
January,2006 |
| Customer: |
Simarsul, SA |
| Value: |
EUR 3.634.000,00 |
| Project Manager: |
Jose Jeronimo |
| Comments: |
Job in Consortium |
| Job: |
Sub-contract for Civil Works for Desulphurization Plant, at the Thermoelectric Power Plant, Sines |
| Job No: |
0516 |
| Awarded: |
October,2005 |
| Customer: |
Hitachi-Cobra Consortium |
| Value: |
EUR 3.507.000,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
Foundations in Reiforced Concrete |
| Job: |
Alteration of Infrastructures in Cascais Marina |
| Job No: |
0515 |
| Awarded: |
October,2005 |
| Customer: |
Marcascais |
| Value: |
EUR 1.550.000,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Quay and Access Steel Pontoons |
| Job: |
Recovery of Sewerage System (Lagos, Algarve / Portugal) |
| Job No: |
0513 |
| Awarded: |
August,2005 |
| Customer: |
Águas do Algarve, SA |
| Value: |
EUR 925.000,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Close Fit System |
| Job: |
Subcontract for Temporary Works at Carregado's Bridge |
| Job No: |
0509 |
| Awarded: |
May,2005 |
| Customer: |
TACE (Consortium with MSF, BPC, Tamega, Lena, Novopca and Zagope) |
| Value: |
EUR 1.310.790,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
Temporary Piled Steel Structures and Preconcrete Slabs |
| Job: |
Repairs to Tanks T-1636, T-1637, T-1638, T-1639, T-1640 and T-1641 and Product Recovery |
| Job No: |
0508 |
| Awarded: |
May,2005 |
| Customer: |
United States Navy |
| Value: |
EUR 7.804.195,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
Contract N62470-05-C-5027 |
| Job: |
Dredging and Workmanships to Coastal Protection in Beaches of the Coast of the Estoril |
| Job No: |
0507 |
| Awarded: |
March,2005 |
| Customer: |
DTCE - Desenvolvimento Turístico da Costa do Estoril, E.M. |
| Value: |
EUR 1.285.000,00 |
| Project Manager: |
Jose Jeronimo |
| Comments: |
Consortium |
| Job: |
Pile Renovation from Water, in Barreiro |
| Job No: |
0506 |
| Awarded: |
March,2005 |
| Customer: |
Barreiro Town Council |
| Value: |
EUR 1.264.500,00 |
| Project Manager: |
Jose Jeronimo |
| Comments: |
|
| Job: |
Recovery of Pontoons and Floating Equipment, including Access Gangways |
| Job No: |
0503 |
| Awarded: |
February,2005 |
| Customer: |
Council of Aveiro |
| Value: |
EUR 747.120,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Mechanical and Steel Works |
| Job: |
Replace Military Housing, Phase III, Lajes Field, Azores |
| Job No: |
0502 |
| Awarded: |
January,2005 |
| Customer: |
United States Navy |
| Value: |
EUR 11.742.000,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
|
| Job: |
Sheetpiling at IP6 (Peniche) and IC1 (A8) |
| Job No: |
0501 |
| Awarded: |
January,2005 |
| Customer: |
Somague Engenharia, SA |
| Value: |
EUR 557.112,00 |
| Project Manager: |
Villy Petersen |
| Comments: |
|
| Job: |
Additions and Alterations to Fitness Center T-333, Phase II / Lajes Field, Azores |
| Job No: |
0433 |
| Awarded: |
December,2004 |
| Customer: |
United States Navy |
| Value: |
EUR 4.592.500,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
Contract N62470-04-C-4024 |
| Job: |
Waste Water Treatment Plant and Outfall Pipe to Redondo and Montoito |
| Job No: |
0432 |
| Awarded: |
December,2004 |
| Customer: |
Águas do Centro Alentejano, SA |
| Value: |
EUR 5.255.480,00 |
| Project Manager: |
Carlos leal |
| Comments: |
Job in Consortium |
| Job: |
Sewage Treatment (WWTP, Pumping Station and Pipelines) in Ribeira Brava Municipality (Madeira's Island) |
| Job No: |
0421 |
| Awarded: |
June,2004 |
| Customer: |
Secretaria Regional do Ambiente e dos Recursos Naturais |
| Value: |
EUR 6.739.000,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
Job in Consortium |
| Job: |
Additions and Alterations to Fitness Center T-333, Lajes Field, Azores |
| Job No: |
0419 |
| Awarded: |
July,2004 |
| Customer: |
United States Navy |
| Value: |
EUR 3.949.000,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
Contract N62470-02-C-2094 |
| Job: |
Emergency Repairs to Breakwater, Phase III |
| Job No: |
0417 |
| Awarded: |
July,2004 |
| Customer: |
Kellogg Brown & Root, Inc. |
| Value: |
EUR 22.416.802,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
|
| Job: |
Design-Build of a Dam at Tagus River, on Abrantes |
| Job No: |
0416 |
| Awarded: |
July,2004 |
| Customer: |
Câmara Municipal de Abrantes |
| Value: |
EUR 9.450.290,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Job in Consortium. |
| Job: |
Design-Build of one WWTP, in Vale Faro (Algarve) |
| Job No: |
0415 |
| Awarded: |
June,2004 |
| Customer: |
Águas do Algarve, SA |
| Value: |
EUR 3.512.305,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Job in Consortium. |
| Job: |
Execution of a Bank Retention and Recovery of the "Caldeira do Alemão" |
| Job No: |
0413 |
| Awarded: |
May,2004 |
| Customer: |
Câmara Municipal do Barreiro |
| Value: |
EUR 788.180,00 |
| Project Manager: |
Jose Jeronimo |
| Comments: |
|
| Job: |
WTP and Marine Outfall of WWTP, in Sao Martinho do Porto |
| Job No: |
0411 |
| Awarded: |
May,2004 |
| Customer: |
Águas do Oeste, SA |
| Value: |
EUR 1.534.000,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Job in Consortium. |
| Job: |
Wall Retention Works (Sheet-piling and Structural Steel) |
| Job No: |
0409 |
| Awarded: |
May,2004 |
| Customer: |
Somague Engenharia, SA |
| Value: |
EUR 865.500,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Sub-contract |
| Job: |
Sheet-piling / TER - Termoeléctrica do Ribatejo |
| Job No: |
0408 |
| Awarded: |
April,2004 |
| Customer: |
Somague Engenharia, SA |
| Value: |
EUR 500.000,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Sub-contract |
| Job: |
Almourol Quay and Ramp Rebuild |
| Job No: |
0407 |
| Awarded: |
April,2004 |
| Customer: |
Vila Nova da Barquinha Town Council |
| Value: |
EUR 279.000,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
|
| Job: |
Design-Build of Oeiras Harbour |
| Job No: |
0406 |
| Awarded: |
April,2004 |
| Customer: |
Oeiras Town Council |
| Value: |
EUR 6.133.500,00 |
| Project Manager: |
Jose Jeronimo |
| Comments: |
Job in Consortium |
| Job: |
Petrogal - Sines Refinery - LPG Bottle Filing Plant |
| Job No: |
0404 |
| Awarded: |
February,2004 |
| Customer: |
Technip Portugal (Petrogal) |
| Value: |
EUR 1.646.553,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Sub-contract of Civil Construction |
| Job: |
Dismant and Demolish of Oil Parking at Rosairinho - Fluvial Area at Moita |
| Job No: |
0326 |
| Awarded: |
December,2003 |
| Customer: |
Batistas - Reciclagem de Sucatas, SA |
| Value: |
EUR 1.661.213,50 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Dismant and Demolish os Existing Quay in Reinforced Concrete (Petrogal) |
| Job: |
Viaduct Construction over VCI, in Oporto |
| Job No: |
0323 |
| Awarded: |
October,2003 |
| Customer: |
Teixeira Duarte - Engenharia e Construções, SA |
| Value: |
EUR 1.403.249,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Steel Structure |
| Job: |
Dental Clinic Replacement, Lajes AFB, Azores |
| Job No: |
0322 |
| Awarded: |
December,2003 |
| Customer: |
United States Navy |
| Value: |
USD 3.075.000,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
|
| Job: |
Construction of a Camping Park on Porto Moniz, Ribeira da Janela (Madeira Island) |
| Job No: |
0321 |
| Awarded: |
September,2003 |
| Customer: |
Porto Moniz Town Council (Madeira Island) |
| Value: |
EUR 1.101.075,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Job in Consortium |
| Job: |
Rebuilding of Fender System - Export Jetty |
| Job No: |
0318 |
| Awarded: |
August,2003 |
| Customer: |
Nova Cimangola |
| Value: |
EUR 2.200.000,00 |
| Project Manager: |
Villy Petersen |
| Comments: |
Design-Build |
| Job: |
CLCM Canical Marine Terminal (Madeira Island) |
| Job No: |
0313 |
| Awarded: |
October,2003 |
| Customer: |
CLCM - Companhia Logística de Combustíveis da Madeira |
| Value: |
EUR 6.500.000,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
|
| Job: |
Design, Furnish and Erection of Floating Pontoons and Access Gangways - Cais do Sodre Hub, in Lisbon |
| Job No: |
0312 |
| Awarded: |
May,2003 |
| Customer: |
Metropolitano de Lisboa, EP |
| Value: |
EUR 2.490.303,00 |
| Project Manager: |
Jose Jeronimo |
| Comments: |
Naval Construction |
| Job: |
Cultural and Parking Spaces at Porto Moniz (Madeira Island) |
| Job No: |
0308 |
| Awarded: |
April,2003 |
| Customer: |
SDNM - Sociedade de Desenvolvimento do Norte da Madeira, SA |
| Value: |
EUR 5.174.000,00 |
| Project Manager: |
Mário Cinturão |
| Comments: |
Job in Consortium. |
| Job: |
Dismante and Demolish of Existing Constructions at Underwater Areas (Alqueva) |
| Job No: |
0304 |
| Awarded: |
January,2003 |
| Customer: |
EDIA - Empresa de Desenvolvimento e Infra-estruturas do Alqueva, SA |
| Value: |
EUR 979.432,73 |
| Project Manager: |
Carlos Leal |
| Comments: |
Job in Consortium |
| Job: |
Perimeter Physical Security Improvements, United States Embassy, Lisbon |
| Job No: |
0303 |
| Awarded: |
September,2003 |
| Customer: |
United States Department of State |
| Value: |
United States Department of State |
| Project Manager: |
Carlos Leal |
| Comments: |
|
| Job: |
Contract Job to make a stockade of piles in Cais do Sodre Transit Interface |
| Job No: |
0233 |
| Awarded: |
January,2002 |
| Customer: |
Metropolitano de Lisboa, E.P. |
| Value: |
EUR 2.424.619,00 |
| Project Manager: |
Jose Jeronimo |
| Comments: |
Several works of dredging and demolitions; armour stone; sheet-piles;concrete |
| Job: |
Jet Fuel Pipeline from Off-base Depot and Additional On-base Storage at Porto Santo Airfield |
| Job No: |
0230 |
| Awarded: |
May,2003 |
| Customer: |
Portuguese Ministry of Defense |
| Value: |
EUR 4.982.652,00 |
| Project Manager: |
Jose Jeronimo |
| Comments: |
Project NATO 99/7PL40601 / Job in Consortium |
| Job: |
Harbour construction - Porto Moniz North Coast - 2nd phase. |
| Job No: |
0229 |
| Awarded: |
January,2002 |
| Customer: |
Portos da Madeira |
| Value: |
EUR 15.958.914,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Heavy construction in reinforced concrete and armour stone to breakwater construction (Job in Consortium) |
| Job: |
Emergency Repair to Breakwater - Phase I, Lajes Field, Azores |
| Job No: |
0228 |
| Awarded: |
January,2002 |
| Customer: |
Halliburton KBR (United States Navy) |
| Value: |
USD 6.926.000 |
| Project Manager: |
Carlos Leal |
| Comments: |
Several works of dredging and armour stone to breakwater reconstruction |
| Job: |
API Tank Repairs (Tanks 1642 and 1643) |
| Job No: |
0221 |
| Awarded: |
July,2002 |
| Customer: |
United States Navy |
| Value: |
USD 3.256.928,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
Tank repairs |
| Job: |
Slip in the Harbour of Nazaré |
| Job No: |
0220 |
| Awarded: |
June,2002 |
| Customer: |
Instituto Portuário do Centro |
| Value: |
EUR 1.103.239,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Several concrete works to make a slip in the harbour |
| Job: |
Natural Gas Pipeline, Sines - Setubal |
| Job No: |
0216 |
| Awarded: |
June,2002 |
| Customer: |
Transgás - Sociedade Portuguesa de Gás Natural, SA |
| Value: |
EUR 21.667.182,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
Job in Consortium |
| Job: |
WTP on Vale da Pedra |
| Job No: |
0214 |
| Awarded: |
June,2002 |
| Customer: |
EPAL, SA |
| Value: |
EUR 2.787.152,00 |
| Project Manager: |
Carlos Leal |
| Comments: |
Water Treatment Plant |
| Job: |
Drain Gallery of Sewerage System, in Mutela, Almada |
| Job No: |
0211 |
| Awarded: |
January,2002 |
| Customer: |
SMAS - Almada Town Council |
| Value: |
EUR 919.649,00 |
| Project Manager: |
Jose Jeronimo |
| Comments: |
Underdrainage gallery (Design-build) |
| Job: |
Replace Military House, Phase II - Lajes Field, Azores |
| Job No: |
0210 |
| Awarded: |
March,2002 |
| Customer: |
United States Air Force |
| Value: |
USD 13.369.000,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
Construction of 52 houses in Lajes Field, Azores |
| Job: |
Aveiro Harbour - Bulk Terminal |
| Job No: |
0131 |
| Awarded: |
December,2001 |
| Customer: |
APA - Administração do Porto de Aveiro |
| Value: |
EUR 21.038.183,00 |
| Project Manager: |
Mario Cinturao |
| Comments: |
Construction of Quay Wall (Job in Consortium) |
| Job: |
Replace Military House, Phase I - Lajes, Azores |
| Job No: |
0111 |
| Awarded: |
July,2001 |
| Customer: |
United States Air Force |
| Value: |
USD 12.890.000,00 |
| Project Manager: |
Pedro Costa |
| Comments: |
Construction of 55 houses in Lajes Field, Azores |
Other contracts awarded: